• Thursday. April 25, 2024

Projects We Executed

S/N
Clients
Projects Description
Remark
121 AM facilities cleaning of stainless steel by the pool side and handrail.

Completed
122 f.c.m.bank fabrication of diesel tank, calibration, supply of water seperator and connection

On-going
123 keystone bank (akoka branch, commercial road apapa branch and awolowo road, ikoyi branch all in lagod). fabrication of diesel tanks, calibration, supply of water seperator and connection

Completed
124 Interkel nig. ltd. fabrication of burglary for nigerian police service i osun, uyo, calabar and benue states.

On-going
125 keystone bank fabrication and installation of scaffolding over head tank at computer village ikeja.

Completed
126 Toyota (Nigeria) Limited fabrication and installation of I T mast (3m self support mast) at lekki phase 1

Completed
127 Keystone bank fabrication, supply and installation of 5000 litres diesel tank with calibration water separator and connection to generator using galvanized pipe at Akoko, Yaba,Ajose Adeogun Victoria island, Awolowo road Ikeja, Awolowo road Ikeja branch e.t.c

Completed
128 Telious Dev Ltd, Oniru Estate Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
129 FCMB Fabrication, supply and installationof 5000 litres and 10000 litres diesel tank

Completed
130 FCMB plc, FMX Intergrated Services Supply and installation of water separator calibration services (Body Dipstick and Chart) at various branches Nationwide

Completed
131 Omoregie motors, Lekki Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
132 AM Facilities Diesel tank calibration and connection with galvsnized pipes to generator at Abacha Estate Ikoyi

Completed
133 Keystone bank Rehabilitation of entrance canopy and metal work at lekki, ketu,ikorodu branch

Completed
134 FCMB Plc Fabrication, supply and installation of 3000 litres diesel tank with calibration, water seperator and connection to generator using galvanized pipes at Aspamda trade fair, Dr site Ikeja, Port-Harcourt main branch, ares 8 abuja branches

Completed
135 OCBN Ltd, Victoria Island Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
136 Smiley Dental Care, Lekki Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
137 Amador Suites, Sangotedo, Lekki Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
138 Profiliant development Resources Fabrication, supply and installation of 2000-5000 litres diesel tank with calibration, water separator and connection to generator using galvanised pipes

Completed
139 Pastor Bola Adams Ochuko Fabrication and metal work

Completed
140 Interkel Nigeria Limited at various States Fabrication and metal work

Completed