• Friday. April 19, 2024

Projects We Executed

S/N
Clients
Projects Description
Remark
101 Oceanic bank plc Fabrication and calibration of 5,000litres tank at mushin branch

Completed
102 Dele Clinton Fabrication of burglary for a building at surulere, lagos.

Completed
103 Oceanic bank plc Fabrication of 5,000litres body calibrated diesel tank, water seperator and connection for creek road apapa and mushin branches.

Completed
104 keystone bank plc Remedial works on carpentry and metal works at ahmadu bello way branch.

Completed
105 F.C.M.Bank Fabrication of 3,000 litres of diesel Body calibrated, deep stick and chart with water separator & deep stick. (18nos) connection inclusive.(northern, southern and eastern branches)

On-going
106 Interkel nigeria limited fabrication of buglary at asaba.(a twin duplex)

On-going
107 Mr. austin Architectural design 2 & 3 bedroom flat at lekki phase 1.

Completed
108 Ambassador Imohe fabrication of buglary, gate at Victoria Garden City

Completed
109 consolidated breweries ltd cleaning, servicing and fixing of there fuel dump at otta, ogun state.

Completed
110 Halal capital fabrication of gate at victoria island in lagos.

Completed
111 mr. steve ulofoshio Architectural design of a 5 bedroom duplex with 1 bedroom boy's quarters

On-going
112 Mr. collins Amajoh fabrication of 2 nos of metal gates at lekki

Completed
113 first city momentum bank plc Fabrication of tanks, calibration deep stick and chart and water serperation in some of lagos branches.

Completed
114 SDV nigeria limited Haulage (transportation)

On-going
115 G.T.bank ikoyi casting and housing generator and transformer plinth and ikoyi

Completed
116 mr and mrs felix ulofoshio development of a 3 bedroom flat 4(nos) at shongotedo

On-going
117 locke international consultancy limited, milliner towers, 39, alfred rewane road ikoyi lagos. Consultancy (security)

On-going
118 f.c.m.bank sabo yaba fabrication of 3,000litrs tank, water separator and connection

Completed
119 Amadas suites in shongo-tedo, lekki-epe expressway, lagos. fabrication of 12,000litres, water seperator and connection for a hotel in shongotedo also stainless steel handrail for the hotel.

Completed
120 AM facilities cleaning of stainless steel by the pool side and handrail.

Completed