S/N |
Clients |
Projects Description |
Remark |
101 | Oceanic bank plc | Fabrication and
calibration of 5,000litres tank at mushin branch |
Completed |
102 | Dele Clinton | Fabrication of burglary for a building at surulere, lagos. |
Completed |
103 | Oceanic bank plc | Fabrication of 5,000litres body calibrated
diesel tank, water seperator and connection for creek road apapa and mushin
branches. |
Completed |
104 | keystone bank plc | Remedial works on carpentry
and metal works at ahmadu bello way branch. |
Completed |
105 | F.C.M.Bank | Fabrication of 3,000 litres of diesel Body calibrated, deep stick and chart
with water separator & deep stick. (18nos) connection inclusive.(northern,
southern and eastern branches) |
On-going |
106 | Interkel nigeria limited | fabrication of buglary at asaba.(a twin duplex) |
On-going |
107 | Mr. austin | Architectural design 2 & 3 bedroom flat at lekki phase 1. |
Completed |
108 | Ambassador Imohe | fabrication of buglary, gate at Victoria
Garden City |
Completed |
109 | consolidated breweries ltd | cleaning,
servicing and fixing of there fuel dump at otta, ogun state. |
Completed |
110 | Halal capital | fabrication of gate at victoria island in lagos. |
Completed |
111 | mr. steve ulofoshio | Architectural design of a 5 bedroom duplex with 1
bedroom boy's quarters |
On-going |
112 | Mr. collins Amajoh | fabrication
of 2 nos of metal gates at lekki |
Completed |
113 | first city momentum bank plc | Fabrication of tanks, calibration deep stick and chart and water
serperation in some of lagos branches. |
Completed |
114 | SDV nigeria limited | Haulage (transportation) |
On-going |
115 | G.T.bank ikoyi | casting and
housing generator and transformer plinth and ikoyi |
Completed |
116 | mr and mrs felix ulofoshio | development of a 3 bedroom flat 4(nos) at shongotedo |
On-going |
117 | locke international consultancy limited, milliner towers, 39, alfred rewane road ikoyi lagos. | Consultancy (security) |
On-going |
118 | f.c.m.bank sabo yaba | fabrication of 3,000litrs tank, water separator and
connection |
Completed |
119 | Amadas suites in shongo-tedo, lekki-epe expressway, lagos. | fabrication of 12,000litres, water seperator and
connection for a hotel in shongotedo also stainless steel handrail for the
hotel. |
Completed |
120 | AM facilities | cleaning of stainless steel by the
pool side and handrail. |
Completed |