S/N |
Clients |
Projects Description |
Remark |
81 | PHCN Egbin | Supply of Electrical Materials |
Completed |
82 | Bank PHB Mid West Region | Fabrication & Calibration of 5,000Litres Diesel
Tanks (12nos) |
Completed |
83 | FCMB Plc | Fabrication of 3,000 litres of
diesel Body calibrated, deep stick and chart with water separator & deep stick.
south west branches (12nos) connection inclusive |
Completed |
84 | Omel Energy Nigeria Limited | Classrooms block design |
Completed |
85 | Ericsson Communications | Industrial Kitchen layout design |
Completed |
86 | GTBank Plc | Concertina wire fence |
Completed |
87 | Interkel Nigeria Limited | Gate,
Burglary protector, Handrail, security doors |
Completed |
88 | Bank PHB Plc | Metal fence fabrication ahmadu bello branch |
Completed |
89 | Bank PHB Plc | Painting and Vertical Blind |
Completed |
90 | Chief Willie M. Obiano | Construction of 2 10,000litres
underground tanks at Chevron
Estate, lagos and Agureri country
home,
Anambra State |
Completed |
91 | Oba Elegusin | Fabrication of diesel tank at Oba Elegusin
house, Chevron Estate |
Completed |
92 | Private Client | Building of 4 bedroom Bunglow at Ikorodu,
Lagos |
Completed |
93 | Private Client | Remodelling of 5 bedroom duplex at Awka,
Anambra State |
Completed |
94 | F.C.M.Bank Plc | 3,000 litres
diesel tank body calibrated, deep stick and chart with water seperator in 6
northern branches. connection inclusive |
Completed |
95 | F.C.M.Bank Plc | Fabrication of 3,000 litres of diesel Body calibrated, deep stick and chart
with water separator & deep stick. south south branches (16nos) connection
inclusive |
Completed |
96 | F.C.M.Bank Plc | Fabrication of 3,000 litres of
diesel Body calibrated, deep stick and chart with water separator & deep stick.
lagos branches (2nos) connection inclusive |
Completed |
97 | PHCN Egbin | Supply of Electrical Materials (resistance temperature tranducer controller) |
Completed |
98 | ABBNG limited | Renovation of the swimming pool and water
treatment plant for ABBng guest house at admiralty road lekki phase 1. |
Completed |
99 | ABBNG limited | Maintenance of the swimming pool and water
treatment plant at ABBng guest house at admiralty road, lekki phase 1. |
On-going |
100 | Oceanic bank. | Fabrication and calibration of 5,000litres
tank at creek road apapa |
Completed |